I offer a handyman service for properties, maintenance, repairs, projects and timber constructions in the West Kerry region. My focus is on attention to detail, industry standards, customer relations and transparent pricing. If you need an interior or exterior project completing with a fast turnaround, I provide a trustworthy and professional service.
Typical pricing for construction projects
I build custom timber framed buildings for different purposes. For example, a fully insulated industry standards structure intended for use as a stable or storage in West Kerry, a general price for a 4.8m x 2.4m (16ft x 8ft) would be between €5,500 - €6,500 depending on size, specification, access and fixings. The price given is just an indication and a site survey would be required for a project of this size.
Typical pricing for maintenance and repairs
I undertake repairs, interior and exterior improvements for properties. For a complete replacement of guttering on an averaged sized 3-bedroom bungalow in the West Kerry region, I would usually charge between €800 - €1,200 depending on type, size, features and fittings. The price is only an indication and the correct price could only be determined with measurements taken on site during a survey.
Why choose me
A Qualified Engineer
Working to industry standards
Attention to detail
Customer satisfaction a priority
Clear pricing
Local tradesman based in West County Kerry
Reliable and prompt service
On-site survey and assessment fees
For larger construction, maintenance, and repair jobs a full on-site assessment will almost certainly be required before a fixed quotation can be determined, however in some cases, for smaller jobs a video chat may suffice if I am able to gain the information needed.
West County Kerry: €100
Other areas of County Kerry: €200 (due to travel time and distance)
The assessment includes:
Measurements and design planning
Evaluation of structural conditions
Access evaluation for machinery
Research and sourcing of materials
Discussion with customer
Assessment of any Logistical limits of site
A written fixed quotation valid for 30 days
If the project goes ahead, the assessment fee is deducted from the final invoice.